This content was compiled automatically and has not yet been reviewed by a technician. For reference only.
For reference only. Always confirm part numbers and procedures for your specific vehicle.
Charging and Power Supply
2026 Tiggo 9 IC-CPD: identify portable charging equipment beyond a cable description
Australian MY26 Tiggo 9 lists IC-CPD / EV trickle charger equipment. Distinguish the portable device from a connecting cable or wall unit.
2026 Tiggo 9 IC-CPD: identify portable charging equipment beyond a cable description
A charging accessory is missing at handover, but “Type 2 cable” on the purchasing sheet may describe a different item. The Australian 2026 Tiggo 9 factory information explicitly lists IC-CPD, also called an EV trickle charger. Retaining the full device name helps avoid describing portable charging equipment as an ordinary connecting cable.
The factory uses an equipment name
The charging section says that Electric vehicle supply equipment is included with the vehicle, with IC-CPD / EV trickle charger in brackets. [T13] This article is limited to MY26 and specifications for production from Jan 2026. The entry identifies the accessory category but provides no separate supply details for the plug, control box or cable.
For a damaged existing accessory, retain photographs of the complete device, nameplate, connecting ends and damage location. Explain whether it is missing, externally damaged or displaying a message. Keep the portable equipment, vehicle charging port and wall unit distinct; inability to charge does not identify which one has failed.
Vehicle charging power does not define accessory input requirements
The vehicle-side AC charging capability in the table does not establish all input requirements on the portable device's nameplate. Its specific rated current and suitable socket details were not publicly available in the reviewed material. [To be verified] Do not use the vehicle rating to select a supposedly universal portable charger, or assume replacing a cable section will restore the complete device.
Scope and verification
This article is limited to Australia; MY26; Chery TIGGO 9; Super Hybrid Elite and Super Hybrid Ultimate. It additionally applies only to the factory specification for production from Jan 2026; this production restriction does not replace the explicit MY26 designation. [Model year and configuration][T13] Factory equipment information identifies functions and parts; it is not a fault or replacement criterion.
No public data were available in the reviewed material for OE numbers, repair parameters, separate parts availability or compatibility and interchangeability. [To be verified] Check compatibility or interchangeability using the VIN and the local factory parts catalogue in Australia.
For parts discussed here, use the parts enquiry page.
[T13]: https://cherymotor.com.au/sites/default/files/2026-05/271_25_Tiggo_9_PHEV_Spec_Sheet_v104.pdf
Related Academy Articles
Charging and Power Supply
DC-DC and on-board charger quoted as one assembly: does integration require complete replacement?
Separate DC-DC and OBC functions, vehicle integration and service-parts scope before deciding on individual or complete assembly replacement.
Charging and Power Supply
2026 Tiggo 8 and Tiggo 9 plug-in hybrid charge ports: confirm the driver or passenger side
Australian MY26 Tiggo 8 and Tiggo 9 charge ports occupy different rear sides. Retain the model and factory side description when selecting parts.
Charging and Power Supply
2026 Chery E5 AC charging: 6.6kW single-phase and 10.3kW three-phase do not identify separate OBCs
Retain supply conditions when reading MY26 Chery E5 Ultimate OBC data, and distinguish AC charging figures from DC fast charging.